• Home
  • About Us
  • Events
  • Submissions
  • Advertise
  • Contact Us
  • NewsVoir
  • Newswire
  • Nasheman Urdu ePaper

Nasheman

India's largest selling Urdu weekly, now also in English

  • News & Politics
    • India
    • Indian Muslims
    • Muslim World
  • Culture & Society
  • Opinion
  • In Focus
  • Human Rights
  • Photo Essays
  • Multimedia
    • Infographics
    • Podcasts
You are here: Home / News & Politics / India / Gaganyaan mission: ISRO, Navy carry out crew module recovery trials

Gaganyaan mission: ISRO, Navy carry out crew module recovery trials

February 10, 2023 by Nasheman

Bengaluru: The Indian Space Research Organisation, along with Indian Navy, carried out initial recovery trials of Crew Module in the Water Survival Test Facility (WSTF) as part of preparations for the Gaganyaan mission.

A Crew Module Recovery Model (CMRM) that simulates the mass, center of gravity, outer dimensions, and externals of the actual Crew Module at touchdown was used for the trials at WSTF of Navy at Kochi in Kerala, the space agency said.

The trials were part of the preparation for crew module recovery operations for the Gaganyaan mission that will be carried out in Indian waters with the participation of Indian Government agencies, the overall recovery operations being led by Indian Navy.

The sequence of operations required for the recovery of the Crew Module were carried out as part of the trials.

Gaganyaan project envisages demonstration of human spaceflight capability by launching crew of three members to an orbit of 400 km for a three-day mission and bring them back safely to earth, by landing in Indian sea waters, according to ISRO.

“As the safe recovery of the crew is the final step to be accomplished for any successful human spaceflight, it is of paramount importance and it has to be carried out with the minimum lapse of time”, an ISRO statement said.

“Hence the recovery procedures for various scenarios need to be extensively practiced by carrying out a large number of trials. The Standard Operating Procedures (SoP) for recovery of Crew and Crew Module need to be finalised. The recovery trials will be initially carried out in a closed pool followed by trials in a harbor and in the open sea”, it said.

The operations carried out on Tuesday form the initial recovery trials of Crew Module in a closed pool. Different phases of recovery trials starting with the recovery of the Crew Module to the flight crew training are planned at WSTF.

WSTF is a state-of-the-art facility of the Indian Navy that provides realistic training of aircrew for escape from a ditched aircraft under varied simulated conditions and crash scenarios, the statement said. WSTF simulates different sea state conditions, environmental conditions, and day/night conditions.

These trials assist in validating the SoP, and training recovery teams as well as the flight crew. They provide valuable inputs for the utilisation of recovery accessories, ISRO said.

The feedback from the recovery team/trainers helps improve the recovery operations SoP, design various recovery accessories, and finalise the training plan, it was noted.

Meanwhile, ISRO said in order to enable booster stage recovery in future launch vehicle configurations, the first Throttling demonstration hot test of the Vikas engine was successfully accomplished for a targeted 67 per cent thrust level throttling for a duration of 43 seconds.

Vikas engine has been the workhorse engine for the launch vehicles of Bengaluru-headquartered ISRO.

The engine with a nominal thrust of 80 ton is powering the second stages of PSLV & GSLV, liquid strapons of GSLV and the core liquid stage of LVM3.

Liquid engines that support throttling of the engine thrust facilitate booster stage recovery in launch vehicles.

Throttling of the engine was achieved by a closed loop thrust regulation system and the engine had been successfully throttled from the chamber pressure of 58.5 bar in steps of 50 bar, 45 bar & 40 bar, with dwelling at each pressure level for seven seconds. In addition, the Vikas engine was also throttled down to 45 per cent for the last three seconds before the engine shut down.

The results of the first hot test of Throttleable Vikas Engine on January 30 indicate stable combustion and subsystem performed in accordance with the prediction, ISRO said.The overall performance of engine sub-systems, control systems & test facility systems were as expected, it added.

Share this:

  • Tweet
  • Print
  • WhatsApp

Related

Filed Under: India, News & Politics

About Nasheman

Follow Us

  • Facebook
  • Twitter
  • YouTube

KNOW US

  • About Us
  • Corporate News
  • FAQs
  • NewsVoir
  • Newswire
  • Realtor arrested for NRI businessman’s murder in Andhra Pradesh

GET INVOLVED

  • Corporate News
  • Letters to Editor
  • NewsVoir
  • Newswire
  • Realtor arrested for NRI businessman’s murder in Andhra Pradesh
  • Submissions

PROMOTE

  • Advertise
  • Corporate News
  • Events
  • NewsVoir
  • Newswire
  • Realtor arrested for NRI businessman’s murder in Andhra Pradesh

Archives

  • May 2025 (9)
  • April 2025 (50)
  • March 2025 (35)
  • February 2025 (34)
  • January 2025 (43)
  • December 2024 (83)
  • November 2024 (82)
  • October 2024 (156)
  • September 2024 (202)
  • August 2024 (165)
  • July 2024 (169)
  • June 2024 (161)
  • May 2024 (107)
  • April 2024 (104)
  • March 2024 (222)
  • February 2024 (229)
  • January 2024 (102)
  • December 2023 (142)
  • November 2023 (69)
  • October 2023 (74)
  • September 2023 (93)
  • August 2023 (118)
  • July 2023 (139)
  • June 2023 (52)
  • May 2023 (38)
  • April 2023 (48)
  • March 2023 (166)
  • February 2023 (207)
  • January 2023 (183)
  • December 2022 (165)
  • November 2022 (229)
  • October 2022 (224)
  • September 2022 (177)
  • August 2022 (155)
  • July 2022 (123)
  • June 2022 (190)
  • May 2022 (204)
  • April 2022 (310)
  • March 2022 (273)
  • February 2022 (311)
  • January 2022 (329)
  • December 2021 (296)
  • November 2021 (277)
  • October 2021 (237)
  • September 2021 (234)
  • August 2021 (221)
  • July 2021 (237)
  • June 2021 (364)
  • May 2021 (282)
  • April 2021 (278)
  • March 2021 (293)
  • February 2021 (192)
  • January 2021 (222)
  • December 2020 (170)
  • November 2020 (172)
  • October 2020 (187)
  • September 2020 (194)
  • August 2020 (61)
  • July 2020 (58)
  • June 2020 (56)
  • May 2020 (36)
  • March 2020 (48)
  • February 2020 (109)
  • January 2020 (162)
  • December 2019 (174)
  • November 2019 (120)
  • October 2019 (104)
  • September 2019 (88)
  • August 2019 (159)
  • July 2019 (122)
  • June 2019 (66)
  • May 2019 (276)
  • April 2019 (393)
  • March 2019 (477)
  • February 2019 (448)
  • January 2019 (693)
  • December 2018 (736)
  • November 2018 (572)
  • October 2018 (611)
  • September 2018 (692)
  • August 2018 (667)
  • July 2018 (469)
  • June 2018 (440)
  • May 2018 (616)
  • April 2018 (774)
  • March 2018 (338)
  • February 2018 (159)
  • January 2018 (189)
  • December 2017 (142)
  • November 2017 (122)
  • October 2017 (146)
  • September 2017 (178)
  • August 2017 (201)
  • July 2017 (222)
  • June 2017 (155)
  • May 2017 (205)
  • April 2017 (156)
  • March 2017 (178)
  • February 2017 (195)
  • January 2017 (149)
  • December 2016 (143)
  • November 2016 (169)
  • October 2016 (167)
  • September 2016 (137)
  • August 2016 (115)
  • July 2016 (117)
  • June 2016 (125)
  • May 2016 (171)
  • April 2016 (152)
  • March 2016 (201)
  • February 2016 (202)
  • January 2016 (217)
  • December 2015 (210)
  • November 2015 (177)
  • October 2015 (284)
  • September 2015 (243)
  • August 2015 (250)
  • July 2015 (188)
  • June 2015 (216)
  • May 2015 (281)
  • April 2015 (306)
  • March 2015 (297)
  • February 2015 (280)
  • January 2015 (245)
  • December 2014 (287)
  • November 2014 (254)
  • October 2014 (185)
  • September 2014 (98)
  • August 2014 (8)

Copyright © 2025 · News Pro Theme on Genesis Framework · WordPress · Log in